Refurbishment Case Study 9
Leighton Library, Installation of Loft Insulation
This report describes thermal performance improvements undertaken at The Leighton Library in Dunblane. In keeping with the preceding Refurbishment Case Studies, the aim of this work was to upgrade the property and improve its thermal performance using materials which were appropriate to the fabric of the building.
Due to the increasing cost of heating the building there was a desire on the part of the Trustees to improve the energy efficiency of the building. In 2011 Historic Scotland awarded a grant to the Trustees to install insulation in the roof space.
-
Audiences
Planners and Owners, Conservation and Heritage Enthusiasts
-
Date Published
01 January 2014
-
Publisher
Historic Environment Scotland
-
Publication Types
Technical, Advice & Guidance, Case Study, Refurbishment Case Studies
-
Format(s)
Download PDF
Refurbishment Case Study 9 (1.27 MB) -
Language
English