Refurbishment Case Study 36
Kinneil House, Bo’ness
This Refurbishment Case Study describes the work completed on an orchard wall with hot-mixed mortar. This work is part of a hot-mixed mortar trial programme intended to progress knowledge of hot lime mortars in historic and traditionally built structures.
The extent of the work was considerable. Approximately 40m of retaining wall was dismantled and re-built. The mortar was flush pointed, making a much smoother and flatter looking wall, with a brighter, lighter colour visually, due to the increased surface of lime.
As with other trial projects, this learning process using a different type of lime mortar proved to be an important part of the project, in addition to enhancing the protection of the wall.
-
Audiences
Planners and Owners, Conservation and Heritage Enthusiasts
-
Date Published
18 September 2019
-
Publication Types
Technical, Advice & Guidance, Case Study, Refurbishment Case Studies
-
Format(s)
Download PDF
Refurbishment Case Study 36 (2.76 MB) -
Language
English
-
Subjects
Architecture